Our team had the privilege of fabricating and installing the structural steel for the new clock tower taking shape at St. John Neumann Catholic Church. Every crew member played a role in ensuring the successful installation and welding of every piece going up focusing on long term reliability.
Custom structural steel canopies fabricated and installed at the Brennan II warehouse. From precise fabrication to a careful installation, our team focuses on durability and long term performance.
This pre engineered structure was carefully erected and welded by our team. from the anchor bolts to the final screws on the r panel, every step was done with precision to ensure longevity and reliability.
From anchor bolt layout to final steel erection, our team delivered this pre- engineered metal building with precision and efficiency. Each phase was handled with care to ensure a smooth build and a dependable structure.
Custom roof access ladder fabricated and installed by our team to meet safety and durabilty standards, while providing durable access
Our team fabricated and installed over 4,000ft of fence panels and gates covering several L.I.S.D schools with one goal in mind. To provide longevity, reliability, and security.